No Result
View All Result
Business Crack
  • News
  • People
  • Big business
  • Northern Lights
  • Jobs
  • Property
  • About us
  • Our partners
  • Contact us
Business Crack
  • Home
No Result
View All Result
Business Crack
No Result
View All Result
Home News

WATCH: Robots tackle Sellafield’s notorious radioactive ‘hot spot’

Business Crack by Business Crack
January 16, 2019
in News
0
Share on FacebookShare on Twitter
The Brokk manipulator arm working inside D Bay

Robots at Sellafield have started to remove radioactive sludge from the most hazardous spot on the site.

The radioactive ‘hotspot’, known to those at the site as ‘D-Bay’, is a sub-section of the First Generation Magnox Storage Pond (FGMSP).

The area was used to deposit radioactive sludge which started to accumulate in the plant in the 1970s.

The sludge is now being carefully ‘hoovered up’ using robotic arms, following 10 years of planning with supply chain partners ACKtiv joint venture and Jacobs.

Head of Legacy Ponds for Sellafield Ltd, Dorothy Gradden, said: “D-Bay has always been one of our biggest headaches at Sellafield.

“It is a concentration of a problem in our most complicated and hazardous legacy facility.

“After years of designing, making and installing the necessary equipment, we are now delighted to be safely reducing the hazard day by day.

“The dedication and innovative thinking of more than 800 people at Sellafield and in our supply chain that has ensured that we safely arrived at this ‘man on the moon’ moment for this plant.

“I’d like to thank and congratulate them all.”

D-Bay in the 70s

D-bay holds the equivalent of 35 concrete mixer trucks full of radioactive sludge, which is a by-product formed from decaying nuclear fuel and other debris.

It has been a no-go area for around 40 years, due to the proximity of the sludge to the surface of the water and the sheer volume of radioactive material.

The work has been done remotely using ‘Brokk’ manipulator robots, operated by people who control them from behind a shielded wall.

The robotic arms are attached to an overhead travelling crane and various tools can be attached to the arm for different tasks.

A suction device is used to ‘hoover’ up the sludge, while other tools allow the arm to pick up larger waste items and chop them into smaller pieces (referred to by operators as ‘giving a haircut’), so that the sludge can be accessed more easily.

The material is being transferred to a state-of-the-art plant for safe storage.

Now 66 years old, FGMSP was originally used to store, cool and prepare magnox fuel for reprocessing.

It is now one of the four legacy ponds and silos at Sellafield that the Nuclear Decommissioning Authority has prioritised for clean-up.

D-Bay is one of the plant’s ‘wet bays’, which were separate areas designed for removing the cladding on nuclear fuel rods.

Work is ongoing to remove waste from the main pond, which is due to be emptied by 2031.

Business Crack

Business Crack

Business Crack is the voice for the Cumbria business community. Brought to you by the team behind Cumbria Crack, we are first for news and opinion.

Have you read?

News

Barrow Business Improvement District gets go-ahead for next five years

Dianne Richardson Picture: BECBC
Latest

BECBC chief executive Dianne Richardson celebrates five years at the helm

Latest

Prestigious accolade for Whitehaven’s The Edge

Hannah Pears of iSH
Latest

Cumbrian organisation ranks among global giants

Sara Murray
Sponsored

Power of adventure – Bendrigg Trust’s Sara Murray confirmed as latest speaker for Conference Cumbria

Picture: Stuart Walker Photography
Latest

Lloyd Motor Group backs Carlisle’s Tullie

Stay connected

Popular Posts

  • £55m contract to resurface roads awarded to Carlisle firm

    1511 shares
    Share 604 Tweet 378
  • Fast-growing Cumbrian firm takes on 14 new staff

    1092 shares
    Share 437 Tweet 273
  • Cumbrian SME secures long-term Sellafield contracts 

    1016 shares
    Share 406 Tweet 254
  • Leading Cumbrian estate agents moves away from high street

    860 shares
    Share 344 Tweet 215
  • Milestone for Sellafield’s newly opened facility

    811 shares
    Share 324 Tweet 203

33 Middlegate
Penrith
Cumbria
CA11 7SY

Phone: 01768 862313
Email: [email protected]

Registered in England as Barrnon Media Limited. No: 12475190
VAT registration number: 343486488

Explore

  • News
  • Northern Lights
  • People
  • Property
  • Big business
  • Expert opinion
  • Jobs

Useful links

  • Contact us
  • About us
  • Article Submission

Follow us on

The Bulletin - our weekly newsletter

Keep up to date with our newsletter

Our regular email will keep you up to date with the latest business news for Cumbria

We don’t spam! Read our privacy policy for more info.

Check your inbox or spam folder to confirm your subscription.

© Barrnon Media Limited 2023

  • Home
  • About us
  • Contact us
  • Terms & conditions
  • Cookie Policy
  • Privacy Statement
  • Disclaimer
This website and its associated newspaper are members of the Independent Press Standards Organisation
No Result
View All Result
  • Home
  • News
  • Northern Lights
  • People
  • Big business
  • Expert opinion
  • Jobs
  • Property
  • About us
  • Our partners
  • Contact us
  • Article Submission
  • Legal
    • Cookie policy
    • Terms & conditions
    • Privacy policy

© 2023 Barrnon Media - Building Better